Programs/Studies


Regional

  • Apex to Mesquite and Moapa Valley Corridor Study
  • Future I-11 Nevada
  • I-15 Central Corridor
  • I-15 Corridor System Master Plan
  • I-15 Mobility Alliance
  • I-15 South Corridor Improvement Sloan Road to Tropicana Avenue Environmental Assessment
  • I-515 Alternatives Development Study
  • I-515 Charleston Boulevard Interchange Environmental Assessment
  • I-80, 2020 Corridor Study
  • I-80 Corridor Systems Management Plan (2014)
  • I-80, 2009 Corridor Study
  • Mt. Rose Highway Corridor Study
  • Proposed Las Vegas Stadium Traffic Assessment
  • Pyramid Highway/US 395 Connection Environmental Impact Statement (EIS)
  • Southern Nevada High-Occupancy Vehicle Plan
  • Southern Nevada Traffic Study
  • US 50 Dayton Operational Study
  • US 50 East Corridor Study 2.1 MB - pdf file
  • US 50 Tahoe East Shore Corridor Management Plan
  • US 395 Land Use Study
  • US 395 Washoe County Corridor Study
  • Western Nevada Study

Innovation and Initiatives

  • Integrated Transportation Reliability Program
  • Pioneer Program
  • Complete Streets Policy - Building Roads For All Users
  • Rest Area Rebuild Program - Rest Area Design Concepts

Traffic Safety Engineering

  • Uncontrolled Crosswalk Treatment Process
  • Safety Management Plans

Statewide

Economy

  • Connecting Nevada - Planning our Transportation Future
  • Cost Allocation Study 2009
  • Goods Movement Study

Environmental

  • Landscape and Aesthetic Corridor Plans
  • Stormwater Management Program

Communications

  • Radio Communications-Nevada Statewide Public Safety Radio System

Nevada Department of Transportation is a proud part of

Elko Area Chamber Market Place

Click Here to Learn More